To the central content area

107 Hualien County Air Quality Purification Zone and Air Quality Monitoring, CEMS Supervision and Maintenance Management Plan

Absrtact
(1) Indoor air quality operations     A total of 29 inspections were carried out in the first and second batches of places. In the case of the Mennono Hospital, the National Army Hospital, the Yazhi Guild Hall, and the World Gym Gymnasium, all the over-standard conditions were due to poor ventilation and insufficient information. Indoor empty products, the project has provided relevant information for reference. According to the first and second batches of the inspection, five units with higher CO2 concentration were selected to conduct expert and scholarly tutoring work, and suggestions for improvement were provided for reference. The project was reviewed from September to November, and all places were equipped with ventilation equipment. Improve to within the regulatory standards. A total of 22 non-administered sites were surveyed and counseled, including parent-child museums, nursery centers, sightseeing factories, and non-administered gymnasiums in the county. In addition, suggestions are made for indoor empty goods operations. It is recommended to purchase direct reading instruments including O3, TVOC, formaldehyde, CO, PM2.5 and other items. In response to the EPA's indoor air quality assessment project, PM2.5 should be implemented by means of announcement. There are 5 indoor air pollutants testing, and it is recommended to set the testing cost. Eli on-site inspection of the operation. (2) Operation and maintenance of air quality monitoring station     Maintain the air quality manual station (3 places) and the automatic station (2 places) in the county's jurisdiction to complete the normal operation, to complete the secondary TSP, PM10, PM2.5, dust collection and release of the three stations of the manual station. Maintenance work; the automatic station part also completes 2 regular monthly maintenance of 2 stations, and the data availability rate is over 98%. 1. Manual station operation and maintenance operation and monitoring results In the case of normal operation and regular maintenance work, the TSP, PM10, and PM2.5 samplers in the three manual stations performed 24 regular maintenance work as of the end of December, 107. No temporary failure occurred and additional maintenance was required. The situation and multi-point calibration and maintenance are performed on a quarterly basis. The average TSP: 27 μg/m 3 from January to December; PM 10: 21 μg/m 3 ; PM 2.5: 10 μg/m 3 . 2, automatic station operation and maintenance operations and monitoring results This year's plan requires a second regular maintenance every month. As of the end of December, 107, the team carried out 24 regular maintenance work on the monitoring equipment of the Fenglin station, and performed annual maintenance and calibration of the automatic station quarterly. During the implementation of this project, the data availability rate of Fenglin Station from January to December averaged 96%, and the monthly sampling data of the automatic station was completed as scheduled. In December 2006, the Fenglin station data was uploaded to the EPD website. Average 1~12 months Fenglin PM10: 28μg/m3; Yuli PM10: 13μg/m3; SO2: 0.7ppb; NO2: 2.7ppb; CO: 0.12ppm; O3: 22.3ppb 3. Local characteristic control effects and achievements PM10 and PM2.5 related control or research work The PM10 and PM2.5 particle concentration and the analysis of the water-soluble ion and carbon-containing species are completed once. The results will be submitted to the Environmental Protection Bureau for review in February. The current information has been updated to December 107, this year PM10 and PM2.5 related control or research work is carried out by the Dahan Institute of Technology Station and the Chengzhong Health Station as the designated station, performing PM10 and PM2.5 aerosol particle concentration and chemical composition (water-soluble ion and carbon-containing species composition) analysis, related regulations or The research work has been independently written into a report for the analysis of PM10 and PM2.5 results. (3) Green beautification and air quality purification area     In order to continue the pollution purification work, this project assisted the Huali County Environmental Protection Bureau to continue to promote the air quality purification area inspection and counseling work, found that the lack of supervision and management units to improve, and assist more towns and cities to apply for the provision of air purification areas To protect the county's good air quality as the goal. A total of 162 inspection operations, 4 air purification areas on-site assessment and 9 carbon sink investigations were completed in the county's air purification area, and 2 of them were combined with Guofu Guoxiao for carbon exchange education. (4) Motor vehicle related business     The plan is based on the content of the contract, and conducts inspections, maintenance, and charging stations for electricity metering operations for quarterly charging stations (56 stations). As of December 2007, the charging stations in the first to fourth quarters have been inspected, maintenance and power usage check operations, and all stations are operating normally. In addition, two new charging stations were added in December 2007, so the total number of charging stations managed by this project is 58 stations. (5) Flue continuous monitoring system CEMS     According to the contract specifications, the CGA, RATA, OP, potential and signal comparison, on-site check and other check operations of the five major factories in the county (Taiwan Peace Plant, Asian Cement Hualien Plant, Heping Power Plant, Zhonghua Pulp Mill), 107 years 1 In December, 12 CGA standard gas check operations (including Hua paper) were completed; 26 RATA supervision and inspection operations were performed; 3 RATA inspection and inspection operations were performed; 48 sub-supervised periodic inspections of OP operations; 32 sub-potentials and signals Enter the comparison operation; the effective monitoring rate of hundreds of points meets the regulatory standards by more than 85%. (vi) Advocacy briefings and meetings 1. Indoor air quality self-management promotion briefing session Invited the Chief of the Environmental Protection Department of the Environmental Protection Department to serve as a lecturer. The first and second batches of public notices were issued for the first and second batches of regulations. The number of participants was about 106, indicating the inspection standards, procedures, improvement methods and penalties of the regulations, and how to implement indoor air. The quality self-management mechanism enables all units to pre-empt indoor air quality management. 2. Empty product purification area management and indoor plant propaganda briefing session The meeting invited the bureaus and offices of the county government and the township and city offices to handle the setting up of relevant personnel and the staff of the existing empty area maintenance units. On March 2, 107, they handled one time, and about 88 people attended, with the hope of the briefing. It can encourage and urge the township and city offices to be responsible for proposing the plan for the provision of air purification zones and supervising the maintenance and management of existing air quality purification zones. It also enhances the air quality of suitable indoor plants in the public environment through briefing sessions. Concept. 3. CEMS connection briefing session Encourage the connected factories (industry) in the county to understand the importance of environmental protection agencies for continuous automatic monitoring and to promote environmental protection for the industry, and provide the latest information on the connection factory control and the actual situation of the connected factories to establish the Hualien County area. The internal flue continuous monitoring connection system functions normally and ensures the correctness of the CEMS data at the plant end. 4. Inter-office meeting on indoor air quality For the relevant places of the Indoor Air Quality Management Law, the bureaus and units of the Authority may first understand the current indoor air quality plan of the EPD, and the Environmental Protection Bureau will explain the relevant powers and responsibilities of each unit and establish the horizontal contact of the relevant bureau of the Hualien County Government. The window will help to grasp the current situation of the Indoor Air Quality Ordinance. After the announcement of the control list, the bureaus will not be able to respond immediately to the policy implemented by the EPD. In addition, there is a partial update of contact information and a continuation of the 106-year list in the contact window. (7) Innovation as a 1. In order to maintain the quality of school teaching, the campus teaching environment will be extended through campus greening, and the campus will be subsidized for an area of ​​1,500 square meters. 2. Cooperate with TOYOTA Eastern Automobile in the empty purification area of ​​this county to handle the Huali County Environmental Protection Bureau Yiliyi Park government decree, and plant 25 trees, covering an area of ​​0.27 hectares. 3. Two enterprises were recruited and two civil society organizations were adopted to participate in the “Selection of Excellent Approved Units in the 107-year Air Purification Zone” of the Environmental Protection Agency. The county's adoption units won a total of 3 awards and one agency promotion award. This Council was also awarded the Merit Award for Promoting Adoption Executives. 4. Promote the awarding information of the Huali County Environmental Protection Bureau Yiliyi Park and the award-winning information of the Air Purification Zone Adoption Unit (Taiwan Xinsheng Daily, Qimo News, Oriental Newspaper and Yanwang) through the media, which can be used as a model for other adoption units. The goal is to achieve the goal of adoption in the air quality purification area and to create a comfortable life and environment for the community. The project is scheduled to run from January 1, 2007 to December 31, 2007. The final work items are in line with the program goals. IX. Project completion ratio in the current period: 100%, schedule control rate: 100%
Keyword
Air quality monitoring station / indoor air quality / green beautification, air quality purification area / low pollution vehicle / flue continuous monitoring system CEMS
Open
top